Material-efficient Cu wire-based 3D printing technology

Area Acceleration (D2) Segment Upscaling (D2.2) Duration 2019/01/01-2021/12/31

Innovat&Match Brokerage Event 2021 R2B 30 lipca 2021

Innovat&Match Brokerage Event 2021 R2B

Date: 17th June 2021

Place: Faenza

On the 17th of June 2021 an online Innovat&Match Brokerage Event 2021 R2B, during which our project was presented. Also the results of tests carried out within WP4 were discussed.

Project Partners

Łukasiewicz Research Network - Institute of Non-Ferrous Metals

  • Development of the Cu-based alloys
  • Development of production technology of feedstock materials for WAAM
  • Wire arc additive manufacturing at laboratory scale
  • Materials investigations

Ghent University

  • Corrosion-fatigue investigations
  • Tests of the prototypes in seawater environment
  • Educational activities

Italian National Agency for New Technologies, Energy and Sustainable Economic Development

  • Material investigations
  • Mechanical proporties

Gefertec GmbH

  • Development of the production process parameters by means of 3DMP technology
  • Implementation of the results of the project (end user)
  • Manufacturing of the new products

Tecnalia Research and Innovation

  • Erosion tests
  • Non-destructive tests

Supported by